To:

SCHEDULE OF CONDITION

Whether you’re a tenant entering into a new commercial property lease or a landlord preparing to grant a new lease, the purpose of a schedule of condition is the same; to ensure that, at the end of the lease term, the property will be returned in the same condition in which it was acquired.

Fail to take adequate protection before entering into a new commercial property lease agreement and you could find yourself at odds with your lease obligations and vulnerable financially – Trinity Rose Chartered Surveyors are here to make sure you don’t fall foul of some very costly dilapidations disputes in the future.

Read more about our Schedule of Condition reporting services, then contact us to ensure you’re not taking on the responsibility for the other party’s repair costs.

Thorough Schedule of Condition reports that cover you today and when your lease ends

A Schedule of Condition is essentially designed to limit the repairing liability of the incoming tenant. When a new lease agreement is to be assigned, an accompanying Schedule of Condition will serve as a written and photographic report that will identify the precise state of repair and condition of the property. In the event of a dispute at the end of the lease term and the condition of the premises is contested, a Schedule of Condition will provide the requisite evidence that a tenant has returned the property in the same state it was at the outset of the term.

Trinity Rose Chartered Surveyors acts for both landlords and tenants by producing concise, yet thorough Schedules of Condition that ensure tenants keep their property in a good state of repair and in accordance with the obligations under the terms of their lease. Our reports contain detailed descriptions and full colour photographs and are annexed to the lease documents.

A schedule of dilapidations listing the repairs that should be carried out on the property can be served by the landlord at the end of the lease – without a robust Schedule of Condition, a tenant is potentially at risk of having to make hefty dilapidations payments in the event that the restorative work isn’t completed. In the case of an older or poorly maintained property, this document may prove invaluable to an incoming tenant.

If you’d like to talk about how Trinity Rose Chartered Surveyors’ Schedule of Condition surveys can support your next lease transaction, please contact us.

  • A formal document to accompany a new lease agreement
  • Protection for landlords and the condition of their leased property
  • Limited repairing liability for the incoming tenant
  • An effective safeguard against potential significant dilapidation payments

We offer Schedule of Condition reports in Hampshire, Dorset and Surrey, including Alresford, Alton, Bournemouth, Basingstoke, Brockenhurst, Bishops Waltham, Chandlers Ford, Chichester, Christchurch, Fordingbridge, Farnham, Lymington, Lyndhurst, Park Gate, Portsmouth, Poole, Parkstone, Petersfield, Ringwood, Romsey, Southampton, Salisbury, Winchester, Verwood, The New Forest and Wimborne and the surrounding areas.

Schedule of Conditions - Trinity Rose
Schedule of Conditions - Trinity Rose
Schedule of Conditions - Trinity Rose
Schedule of Conditions - Trinity Rose

FAQs

What is a Schedule of Condition?

A Schedule of Condition Survey is a detailed inspection and report that documents a property’s current state and condition. This survey is often carried out before a lease starts to record the property’s condition and establish a reference point for future comparisons. It is non-diagnostic in nature.

Why do you need detailed photographs and text?

The only way to comprehensively document any issues is to include both photographs and text. While the photographs provide an excellent visual reference, the text can elaborate, describe, and explain anything that is not shown in the picture. Sometimes, an annotated plan showing the location of each photograph can be a very useful addition to a Schedule of Condition.

Do I need a Schedule of Condition?

We recommend that a schedule of condition is agreed for any property which has existing defects or issues, as a condition of lease. These surveys can help landlords and tenants negotiate the terms of the lease before it is signed and in dilapidations negotiations at the end of the lease, ensuring the tenant is not held responsible for pre-existing issues.

What does a Schedule of Condition involve?

A Schedule of Condition involves a detailed inspection and documentation of a property’s current state. The process is designed to create a comprehensive record of the property’s condition at a specific point in time.

The surveyor will visit the property to conduct a thorough inspection of all agreed areas, often including both the interior and exterior. This may include walls, floors, ceilings, roofs, windows, doors, fixtures, and fittings. He/she will then take extensive photographs to visually document the condition of each area. These photographs serve as key evidence in the report, showing any existing defects, wear and tear, or areas of concern.

Once the site inspection is complete, the surveyor will compile all the collected data, photographs, notes, and observations into a comprehensive report.

What does a Schedule of Condition include?

It includes a detailed inspection report with written descriptions, photographs, and sometimes measurements of the property’s condition. It documents any visible defects, wear and tear, or structural issues. 

A Schedule of Condition report should include the following:

  • The purpose of the survey
  • Details of property location
  • Date of inspection
  • Details of the extent of the property
  • Restrictions of the inspection (anything that may have impacted the outcome of the survey)
  • Weather conditions
  • Description of the property and its condition
  • Photographs and any relevant drawings
  • Definition of terms used in the document

Is a Schedule of Condition Survey a legal requirement?

A Schedule of Condition Survey is not a legal requirement, as it must be agreen by the landlord and tenant to be incorporated in the lease.

Is a Schedule of Condition a legally binding document?

If a Chartered Surveyor prepares a Schedule of Condition report, it can be considered a legally binding document. The details of the property and supporting photos/drawings give this report legal standing, and courts often treat it as a binding contract between parties.

Can a Schedule of Condition be used in disputes?

Yes, it can serve as evidence in disputes, particularly if issues arise related to property conditions, repairs, or maintenance responsibilities. It provides a factual basis for resolving conflicts and it is an essential reference document in lease-end dilapidations matters between the landlord and tenant.

How long is a Schedule of Condition valid?

A Schedule of Condition has no set expiry date. It is designed to be a ‘snapshot in time’ and a reference document which serves to benchmark condition at a specific date.

How much does a Schedule of Condition cost?

The cost varies depending on the property’s size, location, and complexity and the professional conducting the survey. For a more accurate estimate, it’s best to obtain quotes from surveyors or inspection firms.

Who produces a Schedule of Condition?

A Schedule of Condition is produced by a qualified professional specialising in property inspections and assessments, such as Chartered Surveyors, Structural Engineers and Building Inspectors.

How can I book a Schedule of Condition Survey?

All you need to do is get in touch with us. We will explain the process and schedule the survey in.

OUR BOOKABLE SERVICES

FAQs

What’s included in a commercial property management service?

Trinity Rose Chartered Surveyors Property Management services are tailored to suit each client and extend from basic landlord services to sophisticated programmes for more complex commercial estates. You can discover more about what’s included here.

What are the main benefits of an acquisition survey?

An acquisition survey will help you avoid any unexpected issues and costs that may appear in the future and give you greater power to negotiate a better deal on your new commercial property. You can find out more about what’s involved in a Trinity Rose Chartered Surveyors acquisition survey here.

Whose responsibility is it to conduct a Schedule of Condition?

It is usually the landlord that agrees to allow a Schedule of Condition to be incorporated into a commercial lease but, as the beneficiary, it is usually the tenant that arranges for the Schedule of Condition to be prepared.  The document is then assessed by the landlord for agreement before incorporation into the lease. Trinity Rose Chartered Surveyors acts for both landlords and tenants in the production and review of Schedules of Condition. It helps to protect the condition of the landlord’s property and is a safeguard against dilapidations claims for the tenant. Read more about what this service entails here.

How can you avoid a dilapidations claim at the end of a commercial lease?

Trinity Rose Chartered Surveyors recommend that dilapidations is a key point of consideration for both landlords and tenants from the commencement of a new commercial lease – this way we can help our clients negotiate the most favourable terms and manage their liability. Read about our dilapidations services here.

How often should you conduct a rent review for a commercial property?

A rent review should take place according to the terms of the commercial lease although, typically, rent reviews take place at five to 10-year intervals. You can read more about Trinity Rose Chartered Surveyors’ rent review service here.

When should you carry out an IRV assessment?

We recommend that building owners, landlords and tenants who are responsible for insuring commercial premises carry out regular IRV assessments, ideally every three years, to ensure reinstatement values remain accurate. Read more about our IRV Assessment service here.

chartered

Trinity House, 123 Winchester Road, Chandlers Ford, Hampshire SO53 2DR

t: 01962 880426

commercial

Trinity House, 123 Winchester Road, Chandlers Ford, Hampshire SO53 2DR

t: 01962 888900

architecture

Trinity House, 123 Winchester Road, Chandlers Ford, Hampshire SO53 2DR

t: 02382 002500

RICS logo